The boat has been disassembled and all of the unwanted holes and dings have been patched. The socket for the anchor light has been removed and a new all around white light will be mounted on the top of the wake tower. So next up is to strip all the cracked and failing gel coat off the bow to prep it for paint.
No comments:
Post a Comment