The flotation foam is done and all the holes have been plugged. I have also run a layer of peanut butter over all the seams to smooth everything out for the last layer of fiberglass that will cover the entire floor. The factory used 1708, but I may go with chop strand mat instead. I still have some holes to drill for the vent hoses, battery cables and bilge pump first though.
No comments:
Post a Comment