Friday, April 12, 2019

Floor Covering

The floor is finally done!  Next up, is to work on the swim step.  I need to get some gelcoat tinted and prep the step itself.  Then I need to template and cut a piece of the foam for that as well as the sun deck.  I think I will also do little step pads on the gunnels so they are not so slick when you get on and off the boat.

Wednesday, April 10, 2019

Floor Covering

I got the gray paint put down around all the edges and under the seams of the floor covering.  I also have the frame of the spotter seat, the base of the driver's seat and the deck plate screwed down with 3M 5200 to seal them up tight.  Although I took this picture before doing that.  As soon as the paint dries a little more I'll be able to stick the floor covering down!

Sunday, April 7, 2019

Floor Covering

It took all afternoon yesterday and all day today, but I finally got the flooring cut.  Next I need to paint all the edges and seams of the floor gray and sand the edges of the foam to get everything nice and smooth.  Then I will be ready to stick it all down.  Should only be a couple more days and the floor will be done!  Then I will move on to the swim step.

Thursday, April 4, 2019

Spotter Seat

The spotter seat frame is finished and ready to install as soon as the floor is done.  I wound up extending the back board to cover the open areas where the backrest didn't cover.  That means we will not have a large gap on either side of the back rest anymore.  The frame was also covered in resin before the carpet was applied.