Friday, January 11, 2019

New Floor

The glass work on the cable tray is all done and the front section of the floor has been glued and screwed in place.  It has several coats of resin along all the edges and the entire bottom side.  I will do the resin on the top side after I get the entire floor installed, tabbed in, the flotation foam is pored under the deck and the holes are patched.

No comments:

Post a Comment