Tuesday, January 22, 2019

New Floor

The starboard side of the floor is cut, waterproofed and installed.  There is only 1 small piece left that goes in front of the motor mounts where the old ski pole used to be.  I have some fiberglass and gelcoat work to do before I can put that piece in though.  So tomorrow I start the fillets and tabbing around the floor.  With any luck I will be able to pore foam this weekend.

No comments:

Post a Comment